You are here
MARK G. MILLER, INC
UEI: JCJVMV9BD1T1
# of Employees: 31
HUBZone Owned: No
Socially and Economically Disadvantaged: No
Woman Owned: No
Award Charts
Award Listing
-
Fast Rising B-Plug (FRBP) Service Life Extension Program (SLEP)
Amount: $1,520,339.10The Intercontinental Ballistic Missile (ICBM) Minuteman III (MMIII) weapon system represents a critical component of the U.S. Strategic Nuclear Triad. This system must remain operational at all times ...
SBIRPhase II2023Department of Defense Air Force -
Landing Gear Model K
Amount: $586,023.06Landing gear manufacturing and overhaul/maintenance processes alter surface material properties that influence fatigue life. Many landing gear components currently in service have been overhauled or ...
SBIRPhase II2022Department of Defense Air Force -
Flexible Unmanned Vehicle Stowage System
Amount: $140,000.00The Navy seeks a vehicle stowage solution that is universally compatible with a wide range of Navy Unmanned Undersea Vehicles (UUVs) and can be utilized on an LPD 17 Class of ship. UUV manufacturers s ...
SBIRPhase I2022Department of Defense Navy -
MLA Sunshade
Amount: $139,646.00During assembly of munitions in forward operational areas, military personnel are exposed to solar radiation that can interfere with safe operating conditions. Consequently, the U.S. Marine Corps requ ...
SBIRPhase I2021Department of Defense Navy -
Landing Gear Fatigue Model K Modification
Amount: $749,427.00Air Force landing gear systems are subjected to surface treatment processes (e.g., chrome plating, cadmium plating, anodizing) an indefinite number of times throughout their service life. During these ...
SBIRPhase II2018Department of Defense Air Force -
Energy Storage System
Amount: $749,230.00This project will develop and demonstrate a rechargeable Energy Storage System (ESS) that will interface directly into an adjustable frequency drive controlling a 100 HP 460 VAC 3 phase induction moto ...
SBIRPhase II2018Department of Defense Air Force -
Energy Storage System
Amount: $149,650.00This project will develop and demonstrate a rechargeable Energy Storage System (ESS) that will interface directly into an adjustable frequency drive controlling a 100 HP 460 VAC 3 phase induction moto ...
SBIRPhase I2017Department of Defense Air Force -
Landing Gear Fatigue Model K Modification
Amount: $149,087.83The Air Force maintains landing gear systems to ensure acceptable structural integrity during their service life.As landing gear systems throughout the Air Force are pushed further and further beyond ...
SBIRPhase I2016Department of Defense Air Force -
Find substitute for Methylene Chloride in depaint operations at Hill AFB
Amount: $149,525.00ABSTRACT: This effort seeks to identify an effective paint remover that does not contain Hazardous Air Pollutants (HAPs) and does not interfere with the metal removal process at the Hill Air Force Ba ...
SBIRPhase I2013Department of Defense Air Force -
Frangible Cables, Ladders and other Accessories for"ILS/GS Structures and other Non-visual Aids"
Amount: $723,460.00ABSTRACT: Select Engineering Services (SES) has developed a composite Instrument Landing System (ILS) tower that improves sustainability (by eliminating costly maintenance) and increases airfield saf ...
SBIRPhase II2012Department of Defense Air Force