You are here

Advanced Frangible Composite Structure

Award Information
Agency: Department of Defense
Branch: Air Force
Contract: FA8201-06-P-0954
Agency Tracking Number: F061-339-2651
Amount: $99,999.00
Phase: Phase I
Program: SBIR
Solicitation Topic Code: AF06-339
Solicitation Number: 2006.1
Timeline
Solicitation Year: 2006
Award Year: 2006
Award Start Date (Proposal Award Date): 2006-08-03
Award End Date (Contract End Date): 2007-05-02
Small Business Information
3064 S 1900 W
Ogden, UT 84401
United States
DUNS: 163654184
HUBZone Owned: Yes
Woman Owned: No
Socially and Economically Disadvantaged: No
Principal Investigator
 Todd McNeill
 Program Manager
 (801) 399-1858
 todd.mcneill@atsi-info.com
Business Contact
 T. Felker
Title: President
Phone: (801) 399-1858
Email: rene.felker@atsi-info.com
Research Institution
N/A
Abstract

The technical objectives of this SBIR proposal include the design and verification of a frangible composite ILS Glideslope Tower that does not require guy wires (i.e., will maintain existing tolerances and mission performance capabilities). ATSI’s technical approach is based upon the high probability that a qualified, frangible Glideslope Tower can be designed and developed using existing/proven technologies. This will occur through first, clearly defining the necessary frangibility requirements for an ILS Glideslope Tower and generating an applicable specification; and second, using sophisticated finite element programs to model the composite materials during a dynamic impact scenario. Through these techniques, the appropriate validation of frangibility for a composite ILS Glideslope Tower can be shown.

* Information listed above is at the time of submission. *

US Flag An Official Website of the United States Government